Agent 3 · Operations cluster

Find the money

Fifteen workflows where businesses lose money, each with the leak hypothesis to test in interviews. The rank is the product of six dimensions scored 1–5. A dimension is scored only from customer evidence; founder preference is not a score.

0 of 15 fully scoredrank = pain × frequency × budget × urgency × ability to pay × repeatability

Workflow ranking
#WorkflowWhere the money leaks (hypothesis)PainFrequencyBudgetUrgencyAbility to payRepeatabilityRankEvidence
—Lead responseLeads that wait hours go to whoever answered first; the cost is the whole job.······unscored0
—EstimatingSite visits and take-offs done by the most expensive person in the company, often for jobs that never close.······unscored0
—QuotingSlow, inconsistent quotes; margin lost to guesswork and unpriced scope.······unscored0
—SchedulingCrews idle between jobs; customers rescheduled by phone; no view of capacity.······unscored0
—DispatchWrong crew, wrong materials, wrong site; drive time nobody bills.······unscored0
—ProcurementMaterials ordered late or twice; pickup runs during billable hours.······unscored0
—Labor utilizationPaid hours that are not on a job — the largest line in most trades.······unscored0
—Material wasteOver-ordering, off-cuts, damaged stock, returns never processed.······unscored0
—Change ordersExtra work done on a handshake and never invoiced.······unscored0
—Job documentationPhotos and notes on phones; disputes lost for lack of a record.······unscored0
—Customer communicationStatus calls that interrupt the crew; reviews lost to silence after the job.······unscored0
—InvoicingInvoices sent days after completion, or not at all for small extras.······unscored0
—CollectionsReceivables ageing while the owner does the chasing personally.······unscored0
—WarrantyCallbacks with no record of what was installed, when, by whom.······unscored0
—Quality controlDefects found by the customer instead of by a checklist before handover.······unscored0